Scope: Insulate and clad piping and equipment on modules in Nisku. Insulate and clad piping, equipment and HVAC ducting on site.
Materials: Mineral wool, calcium silicate, aluminum and stainless steel cladding, soft cover removables.
Man-hours: 25,000 manhours on module work. 175,000 manhours on site.
Incidents: Zero
Contractor: Ledcor Industries/ Imperial Oil